There are no fees charged. Award Amount: Aggregate Not-To-Exceed $16,000,000 We no longer support this browser, so parts of the site might not work as you expect them to. amount of that limit be used. Line, Brooklyn, D81438: PMC for Replacement of 4 Escalators at 2 Stations (DeKalb Ave & 161st - Yankee Stadium) in the Boroughs of NY & 18 Escalators at 7 Locations (Whitehall St-South Ferry, 145th, Smith-9th St, 5 Ave/53rd St, Parkchester, 59th St, 59th St-Lex Ave), D81434: PMC for Flushing Bundle Station Renewal & Thru Span Rehab at 61st Station Woodside Station, Replacing 4 Escalators, Overcoating Track Component from 48th to 72nd St on Flushing Line +Station Renewal, C-43063: Upgrade Communication Room MR #166 at 14th Street (IND) 8th Avenue Line, C-43058: Upgrade Communication Room MR #203 Rockaway-Beach 116th (IND), Rockaway Line, S-48010: Installation of CBTC equipment supplied in Contract S-48017 for QBL East, S-32156: Sandy Repairs 200-207th Street Signals, Track & Switches, S-48017: CBTC equipment supplier contract for QBL East, PS21008: Project Management Consultant for Penn Station Access Project, CS00001M: PAV Preliminary Engineering and Project Management Services for PAV Replacement, MP-09: Replacement of Tower Elevator Systems and Miscellaneous Repairs at the Marine ParkwayGil Hodges Memorial Bridge, HH-36: Design-Build Services: Rehabilitation of Dyckman St. & Kappock St. Substations, Enhance Electrical Power Resiliency, HHB Maintenance Garage Build Out, Second Floor Air Handler Unit Installation, Park Path Resurfacing, Lower-Level Sidewalk Widening, A-37356: Repair of Subway Street Stairs S1 & S4 at the Elmhurst Avenue Station, QBL, Queens, C-52161: Passenger Identification (PID) CCTV System at 49th and 8th St. Stations, Broadway Line, Manhattan, C-52162: Passenger Identification (PID) System at 23rd St. and Rector St., Manhattan, C-43062: Upgrade Communication Room MR #170 at the Chambers Street Station, 8th Avenue Line, Manhattan, Penn Station Access: Penn Station Access Design Build RFP, C-34712: Roof Repair at Tiffany Iron Shop North in the Borough of the Bronx, GFM-544: SBMP Tier 2 for Emergency Egress Signage at the Hugh-L. Carey Tunnel and Queens Midtown Tunnel Buildings, RK-23D/RK-83: North Wacinway Connection at the HRLS and HRLS Fender Upgrades and Pier Restoration, BW-14C: Miscellaneous Structural Repairs, Cleaning and Painting at the Bronx-Whitestone Bridge, Contract 6398: Replacement of Queens Interlocking Signal System, M-44146/7: Mainline Track Replacement 63rd Street Line IND, Jamaica and Myrtle Avenue Lines BMT, in the Boroughs of Manhattan, Queens and Brooklyn, HCM-383: Manhattan Blower Bldg Floor Wall Coating/Morris St Ped Bridge, VNM-396/VNC-1902: Various Landscaping at the Verrazano-Narrows Bridge, A-37135: Design/Build for Accessibility Upgrades Stations Package 2, C-30539: Wellpoint Rehabilitation- Lenox Avenue Line, A-37679: Grand Central: Main Mezzanine Finishes / Lexington, E-40201: Fan Plant SCADA Head-End Upgrade in the Boroughs of Brooklyn, Manhattan and Queens Firm: CRC Associates, C-52160: Passenger Identification (PID) CCTV System at Prince Street Station/Broadway in Manhattan, C-52159: Passenger Identification (PID) CCTV System at 28th Street Station / Broadway in Manhattan, A-36164: ADA: 68 St-Hunter College / Lexington, MN-142487: Croton Falls Parking Lot-Sidewalk. To help root out this information, RSP, the Office of Legal Affairs, and the IRB have put together the attached supplemental questionnaire. Some of the core projects that will be awarded in 2020 as part of the Metropolitan Transportation Authoritys (MTA) $54.8-billion 2020-2024 Capital Program have been announced by MTA President of Construction and DevelopmentJannoLieber. The MTA has approved a $32.8 million contract to install permanent suicide-prevention fencing on the entirety of the Verrazzano-Narrows Bridge, expected to be completed within two years.. Governor Kathy Hochul today announced that the Metropolitan Transportation Authority (MTA) has approved a design-build contract for the Penn Station Access Project, which will provide direct Metro-North service from the Bronx, Westchester and Connecticut to Penn Station and Manhattan's west side. Fax: 608/262-5111, Effort Commitments and Payroll Certification, Extramural Support Policies and Procedures. They provided Oracle developers, systems analysts, project managers and database administrators supporting multiple system implementations at the MTA. To submit a bid protest, contact Kuvershen Ayer. The project will add four new Metro-North stations and is estimated to reduce commute times by up to 75 minutes for some passengers [see " Plan to bring Metro-North service to Penn Station ,". Of the 29 MWBEs, 20 are based inside New York State, including 11 from New York City. : 646-529-6635,516-938-5476. Arcadis of New York, Inc. (212) 251-7121 If you do not know your Vendor ID, have questions about the MTA Portal or Registration, call the MTA Business Service Center at 646-376-0123 - Option 3, Monday - Friday, 8:30AM - 5:00PM, or by email bscservice@mtabsc.org. We are delighted that you'd like to resume your subscription. If this is the case, we need to see if theres any ability for us to share the materials. Line, IND, in Manhattan and the 138th St. - Grand Concourse Station, Jerome Av. If you do not know your Vendor ID, have questions about the MTA Portal or Registration, call the MTA Business Service Center at 646-376-0123 - Option 3, Monday - Friday, 8:30AM - 5:00PM, or by email bscservice@mtabsc.org. The MTA is working to extend the contract past current scheduled expiration in February 2021 by another two years. The various critical projects included the centralized train scheduling system project and the managed print service program. The Foundation for Rural Service (FRS) awards scholarships to an exceptional group of rural students for their first year of college or vocational school. WISPER record should include the Biomaterial Addendum (signed by PI). MTAs are not used for purchase of commercially available materials. SDVOB Set-Asides shall be assessed for M/WBE participation goals pursuant to Article 15-A of the executive law. Mailing Address: The bid results show only the relevant amounts contained in the bids. MTA on behalf of Bridges & Tunnels is soliciting the below INQs. Major commitments scheduled for 2020, out of both the 2020-2024 Capital Program and prior programs, include: https://www.linkedin.com/company/masstransit. If you wish to attend virtually please email BSCVPROCSOL@MTABSC.ORG by Noon one day before the Public Opening Date for further instructions on the bid opening details. We have detected you are using an out-of-date browser. As a best procurement practice in awarding capital construction contracts, the MTA requires pre-award background checks to determine whether prospective contractors have had poor performance records on prior MTA contracts. We no longer support this browser, so parts of the site might not work as you expect them to. Firm: Power Resources International, Inc. Firm: Citnalta/Scalamandre JV (CSJV), Firm Phone No. PI and Department initiate WISPER record for deposit. This agreement is used for the transfer of biological materials and requires both institutions to be signatories to the UBMTA Master Agreement. Lin International (212) 228-0662 Lin International (212) 228-0662 We have gained greater exposure and subsequent opportunities with many organizations in NYC and New York State, allowing us to showcase our strengths and the Business Transformation skills we utilize in our core business., The MTAs focus on Minority and Women Owned Businesses has clearly made a difference,said ColleenMolter, President, QED National. 147 0 obj <>/Filter/FlateDecode/ID[<85D32E16DACED141ACBFDD02A5CFFF56>]/Index[123 39]/Info 122 0 R/Length 115/Prev 168910/Root 124 0 R/Size 162/Type/XRef/W[1 3 1]>>stream Whether the materials were obtained from a third party, or contain or incorporate materials obtained from a third party. MP Engineer, P.C. The agreement under which we obtained the materials my prevent us from further distributing them, or may impose specific terms on how and to whom we may further distribute the materials or modifications of the materials. MWBE/SDVOB Goal:15% MBE/15%WBE/6%SDVOB, Contract #:CS086 Adopting these new processes for MTAs should positively affect the processing times of MTAs. Firm: Henningson Durham & Richardson Architecture and Engineering, P.C. Component orders. Dr. Ludwig forwards WiCell Deposit sheet to WARF for review along with the PI completed Invention Disclosure Form. and Fulton St. Stations, Crosstown Line, IND, in Brooklyn, C34864: Car Washer Repairs: Concourse Yard, C52164: Furnishing & Installing Passenger Identification (PID) CCTV at 103rd St. Station,8th Av. PI/Department downloads and completes the. Virtual opening for these events will be conducted. Rotator Staffing Over the life of the 50-year agreement, Accelerate Maryland Partners will invest an estimated $300 million in transit for Phase 1 South, $50 million in community grants, and $25 million to support emerging technologies, MDOT said. SJH Engineering, P.C. :201-343-3478/201-289-1084. After a thorough review process, the T's primary goal is to ensure that all contracts are awarded to the lowest responsive bidder, within specification requirements and in compliance with MBTA Procurement Policies and Procedures and other Federal and State laws, rules and regulations. A firm must register at www.mymta.info to gain access to the solicitation (s) listed below. A bid is responsive when it meets the requirements of the Sales Proposal. : 631.564.2613/ jdier@Citnalta.com. Novalink Solutions, LLC (770) 239-1641 We have detected you are using an out-of-date browser. The assignment size increase to a maximum of $1 million is a result of legislative reforms that give the MTA program more flexibility, and allow it to award the largest MWBE assignments of 97 New York State Agencies and Public Authorities. Firm: Enovate Engineering and Land Surveying, PLLC, Firm:Gedeon Engineering, PC dba Gedeon GRC Consulting, Firm: Apache Environmental and Development. MTA Headquarters is soliciting the below INQs. This Contract contains funding provided by the U.S. Department of Transportation through a Grant from the Federal Transit Administration, Contract #: PS866A PS866Z RSP signs the Biomaterial Addendum, attaches the MTA to the addendum, and sends to WiCell. Gonzer Associates DBI Projects LLC Firm: Fairfield Refrigeration & Cooling Equipment. Goals Set: 15%/15%/6% for M/W/SDVOB, respectively, Firm Phone No. In these instances, the researcher should connect with their contact at WARF, or mta@warf.org, to coordinate the agreement around the distribution of the material to the recipient. RSP reviews record and determines if there are any other terms required for the MTA that WiCell will use for third parties. A final determination will be made while coordinating with the researcher and WARF. Firm: Empire Construction and Property Management Group, Inc. Contract #:PS865-1 PS865-34 That includes five stations in the Bronx including one Metro-North station, six stations. Once on the MTA Portal click on the . Popli Arcitectural & Engineering (212) 256-8411 Working with an organization the size of the MTA provided us with greater visibility and the chance to provide resources in key areas to support MTA technology transformation efforts. Management Concept Systems & Services, Inc. (732) 203-9600 Aptim Engineering New York, P.C. Firm:TAP Electrical Contracting Service, Inc. Firm Phone No. For WiCell deposits, a specific process has been worked out between UW-Madison and WiCell. Armand Corporation (856) 489-8200 The OEBO Contract Compliance staff monitor all SBE and DBE activity on all METRO contracts with small business goals and ensures compliance with all local and federal regulations. Award Amount: $52,990,000 The MTA spends over$7 billion annually on procurement, ranging from office supplies and market research to railcars and construction contracts. We ask that researchers please review the MTA agreement in conjunction with existing obligations and the Important MTA Considerations listed above. To learn more about the MTAs MWBE Program,click here. MTA will award contracts this year for full ADA accessibility at 25 stations throughout the network. Jackson Avenue Station, Flushing Line, IRT, in the Borough of Queens, D81433: Project Management Consultant (PMC) Services for the ADA Accessibility Upgrade and Station Improvements of Eight (8) Stations in the Boroughs of Brooklyn, Queens, Manhattan, and the Bronx, C52147: Furnishing & Installing Electronic Security Systems (ESS) at the Wall St Station, Lexington Avenue Line, IRT Division and the Broad St Station, Nassau Loop Line, BMT Division in the Borough of Manhattan, CM030: Design-Build Services for Passenger Experience Enhancements and Finish Detailing for the East Side Access Project, CH058B: Design/Build Services for East Bound Re-Route Construction for the East Side Access Project, A37360 (SBMP): Street Stair Repairs at Rector Street Station, Manhattan, A37354 (SBMP): Street Stairs Repairs S6/M7AB at Ralph Avenue Station, Brooklyn, A37347: Elevated Street Stair Repairs S7/M13, S8/M10 at Brighton Beach Station, Brighton Line (BMT), in the Borough of Brooklyn, C34857: Sandy Repairs, Rockaway Line Wrap-Up, B Division, in the Borough of Queens, MN-143286: SBMP Beacon/Cold Spring Paving, 6377: Blue Point Yard Parking Lot Reconstruction, 6397: TVM Shelter Shed at 2 Stations--Brentwood and Deer Park Stations, RK-58: Randalls Island Roof Replacements and Fall Protection (SBMP), W81119-1: Ultra-Wideband (UWB) based Train Control System Pilot Program, W81119-2: Ultra-Wideband (UWB) based Train Control System Pilot Program, R50464: Replacement of Heating System at Main Street/Flushing Station, Flushing Line, in the Borough of Queens, E-34025R: Replacement of Two (2) Hydraulic Elevators at Grand Central Station Lexington Line (IRT); and Communications & Electrical Work for One (1) Hydraulic Elevator on the Flushing Line in the Borough of Manhattan, C43052: Upgrade of Communication Room 372A, Longwood Avenue Station, Borough of the Bronx, C30401: Rehabilitation of Deep Wells & Control Upgrade on the Nostrand Avenue Line in the Borough of Brooklyn, E34025R: Replacement of Two (2) Hydraulic Elevators at Grand Central Station Lexington Line (IRT); and Communication & Electrical Work for One (1) Hydraulic Elevator on the Flushing Line in the Borough of Manhattan, CM020 (SBMP): 37th Street Civil Work and Salvadoran Consulate Sidewalk Beam Repair, RK-PT: Cleaning and Painting of the Manhattan Plaza and Ramps at the Robert F. Kennedy Bridge, MP-PTX: Painting of Upper-Level Steel Work at the Marine Parkway Bridge, A37334: Subway Street Stairs at Grand Avenue-Newtown Station, Broadway Line (BMT), Queens, R50463: Installation of HVAC System at Forest Hills -71st Avenue Station, Queens Line (IND) in the Borough of Queens, C43053: Upgrade of Communication Room #343, Nostrand Avenue Station, Eastern Parkway Line, Brooklyn, B40611: Chassis Wash and Lift Replacement at College Point Bus Depot, Queens, E-34028: Replacement of 8 Traction Elevators at Various Locations (Clark Street), GEC-20-3042: Construction Administration and Inspection Services for Project RK-PT, Cleaning and Painting of the Manhattan Plaza and Ramps at the Robert F. Kennedy Bridge, C40247: Upgrade of CNG (Compressed Natural Gas) Facility Equipment at Spring Creek Bus Depot in the Borough of Brooklyn, E31713: Fan Plant Damper System Rehabilitation at Seven (7) Locations in the Boroughs of Brooklyn and Queens, P36692: Miscellaneous Work at Concourse East 144th Street Substation Roof & Enclosure in the Bronx, C48721: Structural Repairs of Ventilators between Stations, Concourse Line (IND), from E 198th Street to E 205th Street in the Borough of the Bronx, A37671:Ventilator Reconstruction at E. 138th Street Grand Concourse Station on the Jerome Avenue Line (IRT), R50466: Replacement of Heating System at Retail Stores at 1720 Church Avenue, Brooklyn, VN-X4: Design Build Services for Installation of the Safety Fence on the Upper and Lower Roadways at the Verrazano-Narrows Bridge, 6392: Installation of Foundations and Platforms for Signal Huts, A-37489: Digital Urban Panel Support/Stair Finishing @ Bedford Ave Station & 1st Ave Station, MN135847: Construction Supervision & Inspection Services for GCT & East Side Access Unified Trash Facility and the FCC/SMO Reconfiguration, MS896: Consultant Services to Develop and Implement MBE, WBE and SDVOB Outreach Program, A37151: Design-Build Services for Accessibility Upgrades at Eight Stations, 600000000027374: Comprehensive Maintenance, Repair and Inspection of Elevators at Eight Stations, C52141: Furnishing and Installing Electronic Security Systems at the 59th Street Columbus Circle Complex, 6355: Replacement of Ocean Avenue Substation, P36704: Replace High Tension Switchgear and Flood Mitigation at Montague Furman Substation in Brooklyn, GEC-20-3041: General Engineering Construction Administration and Inspection Services for Project RK-07 Ph1A, Structural Repairs at the RFK Bridge (Category B1 Line Structures), C40276: Window Replacement at JFK Bus Depot, C40275: Storerooms and Overall Reconfiguration at LaGuardia Bus Depot, E30512: Replace 8 Escalators 125th, Pelham Bay Park & Pelham Parkway, 181st Stations in Manhattan and the Bronx, E34026: Replace (11) Hydraulic Elevators at Various Locations in Manhattan, Brooklyn & Queens, W47019: Furnishing, Installing, and Testing Connection-Oriented Ethernet: Phase 3B at various locations, A37700: Furnishing and Installing Mechanical Closure Devices at Multiple Locations, C40274: Rehabilitation and Facility Upgrade at College Point Bus Depot (Queens), C30844-51: Indefinite Quantity Asbestos Abatement and Other Environmental Remediation Services, CH063: Design/Build Services for Harold Catenary Construction for the East Side Access Project, PS898: Environmental Engineering Consulting Services for Penn Station South Expansion, S33933: Code Cable Replacement on the Broadway/7th Avenue Line, IRT, in the borough of Manhattan, S33932: Life Cycle Replacement of Code System Phase I, Jamaica & Myrtle Avenue Lines, S33931: Life Cycle Replacement of Wheel Detector (WD) Speed Enforcement Systems, C52154: Installation of PID Box and Cables-CCTV at 18th Street Station, Manhattan, A31750E: Design and Construction of Accessibility Upgrades at 149th Street-Grand Concourse Complex, A37332: Street Stair Repairs S4/P6 at Prince St. Station, Broadway Line, BMT, Manhattan, P36444: Design-Build Services for the Rutgers Tube Rehab, C52153:Furnishing and Installing Passenger Identification (PID) CCTV System at 23rd Street Station, in the Borough of Manhattan, A37330: Subway Street Stair Components at Canal Street - 8th Avenue, Manhattan, C52152: Installation of PID Box and Cables - CCTV at 28th Street Station, Manhattan, C48703: Line Structure Component Repair Eastern Parkway Line (IRT), Brooklyn, A37328: Remedial Structural Work at Street Stairs S1 & S4 at 75th ST Elderts Lane & S4 at Cypress Hills Station, Jamaica (BMT), A37327 : Remedial Structural Work St. Stairs S1, S3, S4 at Woodhaven Blvd.& S1/M1, S2 at 85th Street Stations, Jamaica Line, 6353: Design-Build Services for Belmont Park Redevelopment of Elmont Station, A31750D: Design and Construction of Accessibility Upgrades at Livonia Avenue Station on the Canarsie Line in the Borough of Brooklyn (Design-Build), PS875: Development of a Master Plan for Penn Station, PS877: Project Management Consulting Services for the New York Penn Station LIRR Train Hall Renovation Project, PS883: Environmental Compliance and Engineering Services for the Penn Station Access Project, MC881A: Water Infiltration Mitigation Services on an AS-Needed Basis, PS864: General Engineering Consultant Services for the Penn Station Access Project, C-34287: Construction of MTA Police Department District 9 Building, CH058A: Harold Trackwork Part 4 B/C Approach Structure of the East Side Access Project, PS865-1 PS865-34: Professional and Technical Staffing and Services (Non-Federal), CS086: Tunnels Systems Package 2 Signal Installation and Testing for the East Side Access Project, PS866A PS866Z: Professional and Technical Staffing and Services (Federal), CH057D: Harold Trackwork Part 3 for the East Side Access Project, PS862-A to PS866Z: Independent Compliance Monitor, 6240: Design-Build Services for the Long Island Rail Road Expansion Project. According to MTA policy, the task orders on these contracts are to be used for smaller projects valued at $500,000 or less. After the initial award of the contract, the respective departments are to Concepts. MTA officials said the agencies launched a joint procurement process in 2019 aimed at breaking up the contract into separate parts to create more competition and to improve customer service. RSP can negotiate incoming material transfer agreements based on discussions with you. 161 0 obj <>stream This historic plan which represents by far the largest investment in MTA history includes more than $40 billion in New York City Transits(NYCT)subways and buses including crucial signal upgrades onsix linesegments and expanding accessibility in the subway and Staten Island Railway systems. As the largest transportation network in North America it is important that we expand contract opportunities for our pool of minority and women entrepreneurs,said MTA Chief Diversity & Inclusion Officer Michael J. Garner. An MTA is a written contract that defines the rights, obligations, and restrictions for both the provider and recipient with respect to the materials being exchanged. LJ. Lieber also announced updates and progress on other 2015-2019 projects, including a new connection for Metro-North to Penn Station, a project known as Penn Station Access. Once on the MTA Portal click on the Vendor Sign-In Registration. : (212) 973-3190, (212) 896-3004, (212) 542-6165, (646) 677-2323, (610) 248- 9358, (646) 284-1266, (814) 591-9160, (332) 209-2015, (212) 266-8393, (212) 330-6277, (646) 602-5839, (646) 943-6764, (646) 264-2524, (212)465-5206, Title: Design-Build Services for Passenger Experience Enhancements and Finish Detailing for the East Side Access Project, Title: Design/Build Services for East Bound Re-Route Construction for the East Side Access Project, Firm: Railroad-Michels Joint Venture, LLC, Firm: Navillus Tile Inc. d/b/a Navillus Contracting, Title: Subway Street Stairs at Grand Avenue-Newtown Station, Broadway Line (BMT), Queens, Title: Installation of HVAC System at Forest Hills -71st Avenue Station, Queens Line (IND) in the Borough of Queens, Title: Upgrade of Communication Room #343, Nostrand Avenue Station, Eastern Parkway Line, Brooklyn, Title: Chassis Wash and Lift Replacement at College Point Bus Depot, Queens, Title: Fan Plant Damper System Rehabilitation at Seven (7) Locations in the Boroughs of Brooklyn and Queens. As we invest in our regions infrastructure we must also invest in these often-excluded diverse entrepreneurs. Finally, the Simple Letter Agreement and the UBMTA were developed by NIH and are really aimed at domestic transfers. Already a subscriber? www.masstransitmag.com is using a security service for protection against online attacks. Become Registered Living Wage Policy and Retention for Service Contracts Firm:Approved General Contracting Inc. Firm:Daves Odd Job Inc. dba D&C Contracting, Firm:City Evolutionary Construction, LLC, Firm Phone No. We recommend updating your browser to the latest version. Tectonic Engineering & Survey Consultants (718) 391-9200 Firms & Phone #:A. G. Consulting Engineers, P.C. Firm: Metropolitan Electric of New York, Inc. Firm: Infrastructure Engineering, Inc. P.C. The MTA and other tolling agencies in New York, including the state thruway authority, have for years relied on one firm, Conduent Inc., to manage all of their tolling operations. Plumbing Repair and Installation - As Needed, HVAC MAINTENANCE AT (LIRR) Hillside MNT Complex. This process is automatic. This signal work is primarily funded in the 2015-2019 Capital Program. To help UW-Madison evaluate the interests that may be involved in the material, UW-Madison has developed the Outgoing MTA Checklist through conversations between RSP, the OVCRGE and the Office of Legal Affairs. Contract A-37379: Station Ventilator Repairs at 23rd Street Station, 8th Avenue Line, Vent Batteries I, J, K, L, in the Borough of Manhattan C35327: Design-Build Services for Rockaways Line Resiliency and Rehabilitation D81443: PMC for Package 3 (3P): ADA Accessibility Upgrades at 8 Stations and Elevator Replacements at 5 Stations Armand Corporation (856) 489-8200 get in touch directly with MTA Procurement contacts. Customer Service. Firms: AECOM USA, Inc., ARUP Us, Inc., Henningson, Durham & Richardson Architecture & Engineering, P.C., HNTB New York Engineering and Architecture, P.C., Jacobs Civil Consultants, Inc., Metro Designers, A Gannett Fleming-Dewberry JV, Michael Baker Engineering, Inc., Mott MacDonald NY, Inc., Parsons Transportation Group of NY, Inc., Stantec Consulting Services, Inc., STV, Inc., Systra Engineering, Inc/Urbahn Architects PLLC JV, T.Y.